The Village of Glenview

Bellwood Sidewalk


2024 public improvement project
Project description


The proposed Project includes approximately 1,300 feet of improvements on Bellwood Lane from West of Longmeadow Drive to Greenwood Road

The following major improvements are included in this project:

  • Installation of approximately 13,000 square feet of sidewalk on both the north and south sides of Bellwood Lane
  • Greenwood Road crosswalk improvements
  • Parkway restoration with sod

LincolnMap2023.png

Contact information

Project Manager: Eric Pugh, Project Manager
(847) 904-4235
epugh@glenview.il.us

Engineering Inspector: Dayvohn Braxton
(847) 904-4238
dbraxton@glenview.il.us

Engineering Division Manager: Adriana Webb
(847) 904-4414
awebb@glenview.il.us

Project information and updates​

Contractor: DiMeo Brothers Inc. of Elk Grove Village, Illinois      

Budget: $350,000

​​​Tentative Schedule

  • Design open house – November 9, 2023
  • Bid award – Anticipated February 2024
  • Design pre-construction meeting – March 20, 2024
  • Approximate starting date of construction – April 2024
  • Approximate completion of construction – May 2024

Schedule may be revised due to inclement weather or other unforeseen circumstances. Work hours are   7 a.m. to 7 p.m. Monday through Friday and 9 a.m. to 5 p.m. on Saturday. Work outside these hours will require Village approval.


​​​Notices

Pre-construction meeting letter​
Open House letter

​​​Handouts

Design meeting presentation

​Pre-construction meeting presentation

​​​Board of Trustees actions

Resolution & Staff Report​​

​​​Project Updates

Sign up​ to be emailed project updates.​​


  
  
  
  
  
  
  
Update
  
  
  
2024 Bellwood Sidewalk4/26/2024Published4/19/2024 3:33 PMEric Pugh 847-904-4235On Schedule
During the week of April 15, the contractor continued excavating for the new sidewalk installation on the South side of Bellwood. During this time all residents still had access to their driveways. Please look for a notification letting residents know when they will no longer have access to their driveways, as the contractor begins placing the new sidewalk.

During the week of April 22, the contractor will begin framing and pouring concrete for the new sidewalk. During this time all residents on the south side of Bellwood will be displaced from their driveways. Parking on the north side of Bellwood and side streets will be allowed during this time. There will be another notice letting residents know they will be allowed back into their driveway once the concrete has sufficiently cured.

Please watch for further information via the project website at: https://www.glenview.il.us/Pages/24Bellwood.aspx or by hand delivered notices.

If you have any questions about the project or project updates please contact the project manager, Eric Pugh, by email epugh@glenview.il.us or phone (847) 904-4235.
4/19/2024Sidewalk Construction
  
2024 Bellwood Sidewalk4/19/2024Published4/12/2024 3:59 PMEric Pugh 847-904-4235On Schedule
During the week of April 8, the contractor removed vegetation that was in the way of the proposed sidewalk. This includes tree trimming, tree transplanting and tree removal. Weather permitting, the contractor will tentatively begin excavating for the new sidewalks on the south side of Bellwood starting at Greenwood and working to the west.
The week of April 15, the contractor will continue excavating for the new sidewalk installation on the South side of Bellwood. During this time all residents will still have access to their driveways There will be another notice letting residents know they will no longer have access to their driveways once they are ready to pour concrete.
Please watch for further information via the project website at: https://www.glenview.il.us/Pages/24Bellwood.aspx or by hand delivered notices.

If you have any questions about the project or project updates please contact the project manager, Eric Pugh, by email epugh@glenview.il.us or phone (847) 904-4235
4/12/2024Sidewalk Construction
  
2024 Bellwood Sidewalk4/12/2024Published4/5/2024 4:16 PMEric Pugh 847-904-4235On Schedule
During the week of April 1, the contractor continued mobilization for the project. This includes utility markings and layout. The contractor will stage material at select locations throughout the project including pipe and manholes. The contractor performed the sidewalk layout.

The week of April 8, the contractor will begin excavating for the new sidewalk installation on the South side of Bellwood. During this time all residents will still have access to their driveways There will be another notice letting residents know they will no longer have access to their driveways once they are ready to pour concrete.

Please watch for further information via the project website at: https://www.glenview.il.us/Pages/24Bellwood.aspx or by hand delivered notices.

If you have any questions about the project or project updates please contact the project manager, Eric Pugh, by email epugh@glenview.il.us or phone (847) 904-4235
4/5/2024Sidewalk Construction