Project description


The proposed Project includes approximately .25 miles of improvements on Hawthorne Lane from East Lake Avenue to Elmwood Avenue.

The following major improvements included in this project are:

  • ​Installation of approximately 1,2000 feet of 8-inch Polyvinyl Chloride (PVC) water main and services
  • Storm sewer improvements, including the installation of 700 feet of 12-inch and 18-inch PVC storm sewer and 1,000 feet of 24-inch Reinforced Concrete Pipe (RCP)
  • Pipe and sanitary manhole repairs and replacement of sanitary services, if necessary
  • Road reconstruction with asphalt pavement
  • Parkway restorations with sod

Hawthorne.png

Contact information

Project Manager: Eric Pugh​
(847) 904-4235
epugh@glenview.il.us

Engineering Inspector: Dayvohn Braxton
(847) 904-4238
dbraxton@glenview.il.us

Engineering Division Manager: Adriana Webb
(847) 904-4414
awebb@glenview.il.us

Project information and updates​

Contractor: DiMeo Brothers, Inc. of Elk Grove Village, Illinois

Budget: $1.7 million

​​​Tentative Schedule

  • Design open house – November 9, 2023
  • Bid award – Anticipated February 2024
  • Design pre-construction meeting – February 21, 2024
  • Approximate starting date of construction – April 2024
  • Approximate completion of construction – July 2024
Schedule may be revised due to inclement weather or other unforeseen circumstances. Work hours are   7 a.m. to 7 p.m. Monday through Friday and 9 a.m. to 5 p.m. on Saturday. Work outside these hours will require Village approval.


​​​Notices

Pre-construction meeting letter​

​​​Handouts

Design meeting presentation

Pre-construction presentation​​

​​​Board of Trustees actions

Resolution & Staff Report​​

​​​Project Updates

Sign up​ to be emailed project updates.​​


  
  
  
  
  
  
  
Update
  
  
  
2024 Hawthorne Lane Improvements4/26/2024Published4/19/2024 3:21 PMEric Pugh 847-904-4235On Schedule
The week of April 15, 2024, the contractor has begun installing storm sewer improvements. The storm sewer improvements involve installing a 24” diameter pipe along Hawthorne, as well as, installing select structures along the edge of the road in the parkway. These storm improvements are designed to improve drainage and reduce flooding in your area.  
The week of April 22, 2024, the contractor will continue installing storm sewer improvements.
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at: https://www.glenview.il.us/Pages/24Hawthorne.aspx  or by hand delivered notices.

 If you have any questions about the project or project updates please contact the project manager, Eric Pugh by email epugh@glenview.il.us or phone (847) 904-4235.
4/19/2024Phase I Underground work
  
2024 Hawthorne Lane Improvements4/19/2024Published4/12/2024 3:47 PMEric Pugh 847-904-4235On Schedule
The week of April 8, 2024, the contractor completed installing new water services that connect each home to the new water main.
The week of April 15, 2024, the contractor will begin installing storm sewer improvements. The storm sewer improvements involve installing a 24” diameter pipe along Hawthorne, as well as, installing select structures along the edge of the road in the parkway. These storm improvements are designed to improve drainage and reduce flooding in your area.  
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at: https://www.glenview.il.us/Pages/24Hawthorne.aspx  or by hand delivered notices.

 If you have any questions about the project or project updates please contact the project manager, Eric Pugh by email epugh@glenview.il.us or phone (847) 904-4235.
4/12/2024Phase I Construction Water Main Installation
  
2024 Hawthorne Lane Improvements4/12/2024Published4/10/2024 11:04 AMEric Pugh 847-904-4235On Schedule
The week of April 1, 2024, the contractor continued installing new water services beginning where they left off the previous week. The inclement weather slowed the operation significantly this week. The new water services connect each house with a new 1.5” copper water service line as well as a new b-box and water shut off. Residents will receive notice before their new water service is scheduled to be installed. While the contractor is connecting your new service, you will experience a water service interruption that could last up to one hour.

The Village understands that not having water, even for a short period of time, is an inconvenience and we greatly appreciate your patience.

The week of April 8, 2024, the contractor will continue installing new water services beginning where they left off the previous week.

Please remember these dates are dependent on suitable weather.

Please watch for further information via the project website at: https://www.glenview.il.us/Pages/24Hawthorne.aspx  or by hand delivered notices.


 If you have any questions about the project or project updates please contact the project manager, Eric Pugh by email epugh@glenview.il.us or phone (847) 904-4235.

4/5/2024Phase I Underground work