Central Road Improvements


2022 public improvement project

​Contact information

Project Manager: Eric Pugh
(847) 904-4235
epugh@glenview.il.us​

Engineering Division Manager: Adriana Webb
(847) 904-4414
awebb@glenview.il.us

Project description

​​The proposed Project includes approximately .25 miles of improvements on Central Road between Lehigh Avenue and Harlem Avenue. The following major improvements are included in the contract:

  • ​Water main improvements consist of the installation of approximately 1100linear feet of 12-inch Polyvinyl Chloride (PVC) watermain and water services on Central Road. The new 12-inch water mains will replace the existing, deteriorated water mains
  • The proposed storm sewer improvements consist of installation of approximately 1000 feet of 12 inch to 18-inch storm sewer pipe to improve storm conveyance, as well as drain the public right-of-way and roadway
  • The proposed Sanitary sewer improvements consist of pipe and sanitary manhole repairs and replacement of sanitary services, if necessary.
  • The proposed pavement improvements on Central Road consist of the installation of new curb and gutter and reconstruction of the road with new asphalt pavement after the underground utilities/upgrades are complete
  • Central Road was initially constructed without curb and gutter and without storm sewers. In 2016 and in 2018, the residents petitioned the Village to install storm sewers and curb and gutter on their street. After holding a public neighborhood meeting and officially balloting Central Road, a majority of support (2/3 of the total votes) was received to construct these improvements and establish Special Service Areas (SSAs). On January 4, 2022, the Village board proposed an ordinance for SSA 67 to construct the storm sewer for 16 properties and SSA 101 to install curb and gutter for 20 properties. Construction work will not start until after the SSA is approved.
  • As part of the SSA process for curb and gutter, the adjacent residents pay 50% of the cost associated with the construction of the new curb and gutter which is based on the Villages SSA policy adopted in November of 2002. Upon completion of the project, the SSA costs will be split proportionally among the participating property owners and repaid through their property taxes over a 10- or 20-year period at an approximate interest rate of 50%. ​

Project information and updates​

Contractor: DiMeo Brothers Inc.

Budget: $1 million

Tentative Schedule

  • Bid award -- February 16, 2022
  • Resident preconstruction meeting -- June 15, 2022; 6 p.m. at the intersection of Harlem and Central​​
  • Approximate start of construction -- July 5, 2022
  • Approximate completion of construction -- Sept. 23, 2022

Schedule may be revised due to inclement weather or other unforeseen circumstances.

Work hours are 7 a.m. to 7 p.m. Monday through Friday and 9 a.m. to 5 p.m.  Saturday. Work outside these hours will require Village approval.​


  
  
  
  
  
  
  
Update
  
  
  
2022 Central Road Improvements9/30/2022Published9/30/2022 4:25 PMTom Hagerty 847-904-4421On Schedule

This past week the contractor completed the installation of the new sod and landscaping. The contractor also placed the final layer of asphalt.

Good News! The project is substantially completed, and this will be the final blog post for the project. We hope you found the information to be helpful and insightful regarding the status of the project and upcoming work.

The Village of Glenview will provide surveys in the future for you to complete regarding the construction work and notifications provided. Please take a few moments to complete this survey. The information will allow us to know what aspects of the project we are doing well at and which areas we need to improve upon in the future.

 
https://www.glenview.il.us/Pages/Central%20Road%20Improvements.aspx
If you have any questions about the project or project updates, please contact the project manager, Eric Pugh, by email epugh@glenview.il.us or by phone at (847) 904-4235.

Thank You for your patience​


9/26/2022Phase III Completion
  
2022 Central Road Improvements9/29/2022Published9/23/2022 2:48 PMTom Hagerty 847-904-4421On Schedule

This week the contractor completed the final standardized testing including leak detection and televising the storm sewer system. The contractor also began prepping for the  installation for the new sod.

The week of September 26, the contractor will complete the installation of the new sod and landscaping. The contractor is tentatively scheduled to place the final layer of asphalt late in the week.

Please remember that all work and correlating dates and time frames are dependent on suitable weather.

Please watch for informational notices delivered to the front door of your home. Further information may also be found on the project website:

https://www.glenview.il.us/Pages/Central%20Road%20Improvements.aspx
If you have any questions about the project or project updates, please contact the project manager, Eric Pugh, by email epugh@glenview.il.us or by phone at (847) 904-4235.

Thank You for your patience​


9/23/2022Phase 3 Parkway Restoration
  
2022 Central Road Improvements9/22/2022Published9/19/2022 4:37 PMTom Hagerty 847-904-4421On Schedule

The week of September 12, the contractor completed reinstating the driveways and backfilling behind the new curbs. The contractor also completed the first layer of new asphalt. Everyone is now able to park back in their driveways. We appreciate your patience during this time.

The week of September 19, the contractor will adjust the manholes for the final layer of asphalt. Furthermore, the contractor will perform the final standardized testing including leak detection and televising the storm sewer system. The contractor will also complete the installation of the new sod and landscaping. The contractor is tentatively scheduled to place the final layer of asphalt the week of September 26.

Please remember that all work and correlating dates and time frames are dependent on suitable weather.

Please watch for informational notices delivered to the front door of your home. Further information may also be found on the project website:

https://www.glenview.il.us/Pages/Central%20Road%20Improvements.aspx
If you have any questions about the project or project updates, please contact the project manager, Eric Pugh, by email epugh@glenview.il.us or by phone at (847) 904-4235.

Thank You for your patience​


9/16/2022Phase 2 Roadway Reconstruction
1 - 3Next

​Find all project updates here.​​

 ​