Project description

This project consists of resurfacing work on the major roads that run through the Glen:  The Glen Town Center (Tower Drive, Navy Boulevard, Valor Drive, Sable Drive, Wolverine Drive and Aviator Lane), West Lake Avenue from Patriot Boulevard to Lehigh Avenue, Shermer Road from West Lake Avenue to northerly project limits, Lehigh Avenue from East Lake Avenue Bridge to Patriot Boulevard, and Compass Road from Lehigh Avenue to Patriot Boulevard.  Along with a new asphalt surface repairs will be made to drainage structure, curb and gutters and sidewalks.

The Glen Main stem road were built between 1998 and 2001, as the former Glenview Naval Air Station was being redeveloped into The Glen. Typically with new development, the final roadway surface course in not placed until after 90 percent of homes or businesses are occupied to limit wear and tear from construction traffic. In this case, however, the main road served as major connector through the community, and therefore needed the final surface course earlier than they originally would have.  With this decision, the Village programmed one additional resurfacing project prior to retirement of The Glen TIF.  In 2016, Phase I of the roadway resurfacing was completed. This project is Phase II and final. 

Project information and updates

Contractor: Arrow Road Construction Company of Mount Prospect

Budget: $2,307,713

Funding: The Glen Tax Increment Financing District (TIF) 

Weekly updates can be found on the project blog at: http://theglenstreetresurfacing.blogspot.com/

Tentative Schedule

  • Start of construction: April 30, 2018
  • Stage 1 Work: April 30 to June 29  (blue on map to right)
  • Stage 2 Work: After August 6 (red on map to right)
  • Final Completion: October 2018

Schedule may be revised due to inclement weather or other unforeseen circumstances.

Work hours are 7 a.m. to 7 p.m. Monday through Friday and 9 a.m. to 5 p.m.  Saturday. Work outside these hours will require Village approval.