Project description​

The Village of Glenview is implementing a roundabout at the intersection of Patriot Boulevard and the Costco Access Roadway to improve traffic operations and to make the conditions safer for pedestrians, cyclists and motorists.

Since the development opened, customers of the area businesses experience regular traffic delays exiting and entering the Costco, Costco Gas Station and Home Depot sites due to competing turning movements and high traffic volumes, particularly during peak hours of operations. The proposed intersection modifications will improve traffic operations and allow more vehicles to proceed on their way without needing to wait, improve safety and reduce vehicle emissions at this intersection, as well as make the conditions safer for pedestrians and cyclists.

Installing roundabouts in place of traffic signals or stop signs has been found to reduce carbon monoxide emissions by 15-45 percent, nitrous oxide emissions by 21-44 percent, carbon dioxide emissions by 23-34 percent and hydrocarbon emissions by 0-40 percent. Constructing roundabouts in place of traffic signals or stop signs also reduced fuel consumption by an estimated 23-34 percent​.

In addition, the Village's traffic study showed that during peak hours of traffic, the Level of Service (LOS) at the intersection will improve from a 'C' grade to an 'A'. An 'A' grade intersection is defined as one that is highly stable with free-flow conditions and little to no congestion.​

A dedicated southbound right turn lane will also be added at this location to address existing traffic queuing during peak hours of business operations. Decorative colored concrete islands, street lighting and landscaping are also planned to enhance this business corridor within The Glen.


You can also learn more about how to navigate the roundabout with this short video​.​

Construction staging will be implemented to minimize disruptions to businesses during construction, with an anticipated start in June 2022.


Public Open House​

The Village held an Open House for resident input and questions on Jan. 25. Click here to view the presentation.


Contact in
formation

Project Manager: Tom Hagerty

(847) 904-4421
thagerty@glenview.il.us

Engineering Division Manager: Adriana Webb
(847) 904-4414
awebb@glenview.il.us​



Project information a​​nd updates​

Contractor: Chicago Paving, Inc.

Budget: $1.1 million 

Project Number: E20-0026

Video: ​https://vimeo.com/616361612​​


Additional information about roundabouts can be viewed on the
Federal Highway Administration (FHA) website. ​


Tentative Schedule
  • Bid award -- December 7, 2022 
  • Approximate start of construction --June 2022
  • Approximate completion of construction -- September 2022

Schedule may be revised due to inclement weather or other unforeseen circumstances.

Work hours are 7 a.m. to 7 p.m. Monday through Friday. Work outside these hours will require Village approval.​


  
  
  
  
  
  
  
Update
  
  
  
2022 Patriot/Costco Roundabout9/29/2022Published9/23/2022 2:46 PMTom Hagerty 847-904-4421On Schedule

During the week of September 19, the contractor began framing for and installing the new curbs in the roundabout area.

The week of September 26, the contractor will complete installation of the new curbs and sidewalks as well as the color stamped concrete in the island of the rounabour. The contractor is also tentatively scheduled to place the first layer of asphalt in select locations for this stage of construction. The contractor will also backfill the new curbs in preparation of landscaping.

Further information may also be found on the project website:

www.glenview.il.us/Pages/Patriot-Costco%20Roundabout.aspx

If you have any questions about the project or project updates, please contact the project manager, Tom Hagerty, by email thagerty@glenview.il.us or by phone (847) 904-4421.

Thank You for your patience​


9/23/2022Phase 2 Roadway Reconstruction
  
2022 Patriot/Costco Roundabout9/22/2022Published9/19/2022 4:34 PMTom Hagerty 847-904-4421On Schedule

During the week of September 12, the contractor completed the storm sewer and water relocation. The contractor also continued installing portions of the new lighting system. Furthermore, the contractor excavated portions of the roadway in advance of the new curbs and sidewalks. The contractor also began placing the new curbs.

The week of September 19, the contractor will complete installation of the new curbs and sidewalks for this phase of construction. The contractor will also backfill the new curbs in preparation of final landscaping.

Further information may also be found on the project website:

www.glenview.il.us/Pages/Patriot-Costco%20Roundabout.aspx

Please remember that all work and correlating dates and times are dependent on suitable weather.

If you have any questions about the project or project updates, please contact the project manager, Tom Hagerty, by email thagerty@glenview.il.us or by phone (847) 904-4421.

Thank You for your patience​


9/16/2022Phase 2 Roadway Reconstruction
  
2022 Patriot/Costco Roundabout9/22/2022Published8/22/2022 3:24 PMTom Hagerty 847-904-4421On Schedule

Roundabout Improvements at Costco/Home Depot Entrance - On Monday August 22, the contractor will pave the right turn lane at the Patriot Costco/Home Depot entrance. On Wednesday, August 24, construction for the roundabout at the intersection of Patriot Boulevard at the Costco/Home Depot entrance will begin. The traffic pattern is set to change during construction as follows:

  • Two-way traffic access to Costco/Home Depot sites will be maintained from the west along Patriot using a free flow turn lane.
  • Patriot/Cardinal will be closed to through traffic.
  • Exiting will be only via intersection at Patriot/Willow
  • Access to Costco will be maintained via Lehigh as well as through the existing Harley Davidson parking lot.
  • Detour/directional signage, as well as message boards, will be posted in advance of closures and traffic pattern changes.

rdbt.png

8/22/2022Roundabout Improvements at Costco/Home Depot Entrance
1 - 3Next

​Find all project updates here.​​

 ​

To sign up for future notifications on this project, fill out the form below. We will email updates on this project when they are available.​

 





​​