Fir Street Improvements
2025 Capital Improvement Project


The proposed Fir Street project includes approximately 1,200 feet of improvements from Shermer Road to the east cul-de-sac, and approximately 130 feet of improvements on the south half of Cedar wood Lane just north of Fir Street.
The following major improvements are included in this project:
- Replacement of existing 1,200 of water main with new 8-inch diameter Polyvinyl Chloride (PVC) water main, including new 1.5-inch water services and new b-boxes.
- Storm sewer improvements including installation of 800 feet of 12-inch and 16-inch storm sewer, new storm sewer service stubs, and new catch basins
- Sanitary service replacements.
- Roadway reconstruction with new asphalt pavement, including new curb and gutter through a Special Service Area (SSA).
- Driveway apron replacement (in-kind).
- Parkway restoration with sod.
Tentative Schedule
- Design Open House: October 17, 2024
- First consideration of an ordinance proposing the establishment of SSA 107: October 15, 2024
- Second consideration of an ordinance proposing the establishment of SSA 107: November 7, 2024
- Contract award: January 7, 2025
- First consideration of an ordinance establishing SSA 107: February 4, 2025
- Second consideration of an ordinance establishing SSA 107: February 18, 2025
- Pre-construction resident meeting: February 25, 2025
- Anticipated start date: March 2025
- Anticipated construction completion date: July 2025
May 16, 2025 05/16/2025
The week of May 12 the contractor started road excavation in preparation of curb and gutter replacement and asphalt paving on Swainwood Drive.
The week of May 19 the contractor will continue road excavation on Swainwood Drive starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
May 9, 2025 05/09/2025
The week of May 5 the contractor finished installing sanitary service cleanouts and all necessary storm sewer repairs on Swainwood.
The week of May 12 the contractor is planning on starting road excavation in preparation of curb and gutter replacement and asphalt paving.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
May 2, 2025 05/02/2025
The week of April 28 the contractor continued installing sanitary service cleanouts for various houses throughout the project limits on Swainwood.
The week of May 5 the contractor is planning on finishing installing sanitary cleanouts and storm sewer repairs and will being curb and gutter repairs towards the end of the week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
April 25, 2025 04/25/2025
The week of April 21 the contractor finished installing water main and water services along Swainwood and Cedarwood. They began installing cleanouts on various homes’ sanitary services.
The week of April 28 the contractor will continue installing sanitary service cleanouts for various houses throughout the project limits on Swainwood.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
April 21, 2025 04/21/2025
The week of April 14 the contractor installed new water services on Swainwood Drive that connect each house to the new water main.
The week of April 21 the contractor will continue installing new water services starting where they left off the previous week. If the contractor finishes installing new water services they will begin storm sewer improvements along Swainwood.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
April 11, 2025 04/11/2025
The week of April 7 the contractor installed new water services on Swainwood Drive that connect each house to the new water main.
The week of April 14 the contractor will continue installing new water services starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
April 4, 2025 04/04/2025
The week of March 31, 2025 the contractor finished installing water main on Swainwood and have begun installing the new water services that connect each house to the new water main.
The week of April 7, 2025 the contractor will continue installing new water services starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
March 31, 2025 03/31/2025
The week of March 24, 2025 the contractor continued installing water main on Swainwood Drive and is now done installing the first section. This first section is from Roosevelt to Cedarwood.
The week of March 31, 2025 the contractor will continue installing water main starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
March 21, 2025 03/21/2025
The week of March 17, 2025, the contractor began installing new water main beginning at Swainwood and Roosevelt and working west. Installation of the new water main is anticipated to take four weeks.
The week of March 24, 2025 the contractor will continue installing water main starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
March 14, 2025 03/14/2025
During the week of March 10, 2025, the contractor began mobilization for the project and prepared the road for the installation of underground utilities on Swainwood. They pulverized the pavement on Swainwood in anticipation of water main installation next week. The contractor will also stage materials throughout the project including pipe and manholes.
The week of March 17, 2025, the contractor will begin installing new water main tentatively beginning at Swainwood and Roosevelt and working west. Installation of the new water main is anticipated to take four weeks.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
March 7, 2025 03/07/2025
Welcome to the project updates page for Fir Street Reconstruction Project. Project updates will typically be posted on Fridays of each week. The contract was awarded to DiMeo Brothers Inc. of Elk Grove Village Illinois.
During the week of March 10, 2025, the contractor will begin mobilization for the project. This includes utility markings and layout in advance of the new water main and storm sewer spot repairs. The contractor will also stage material throughout the project including pipe and manholes.
The week of March 17, 2025, the contractor will begin installing new water main tentatively beginning at Swainwood and Roosevelt and working west. Installation of the new water main is anticipated to take four weeks.
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
YOUR EMAIL ADDRESS IS SUCCESSFULLY REMOVED FROM UPDATE ALERT LIST.
Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.
2025 Capital Improvement Program Map
2025-2029 Capital Improvement Program Map
2025-2029 Capital Improvement Program List
You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.
Fir Street At-A-Glance
Contractor: DiMeo Brothers
Budget: Estimated at $1.6 million*
*These costs are estimates. Actual costs will be based on the lowest bid and the loan interest rate for the SSA portion of the project.
Fir Street Project Library
Dayvohn Braxton
Engineering Project Manager
(847) 904-4238Jon Trent
Capital Projects Manager
(847) 904-4236What can we help you with today?
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.