Swainwood Drive & Cedarwood Lane Improvements

2025 Capital Improvement Project

Swainwood Dr & Cedarwood Ln Improvements
Paving
 

The proposed project includes approximately 1,600 feet of improvements on Swainwood Drive from the west cul-de-sac to Roosevelt Avenue, and approximately 150 feet of improvements on Cedarwood Lane from the north cul-de-sac to the north half of Cedarwood Lane.

The following major improvements are included in the project:


  • Replacement of 2,400 feet of existing watermain with new 8-inch diameter Polyvinyl Chloride (PVC) watermain, including new 1.5-inch water services and new b-boxes
  • Installing additional inlets and storm sewer laterals
  • Roadway resurfacing with new asphalt pavement
  • Curb and gutter repairs
  • Driveway apron replacement (in-kind)
  • Parkway restoration with sod
Tentative Schedule
  • Design open house meeting: October 17, 2024
  • Contract Award: January 7, 2025
  • Pre-construction resident meeting: February 25, 2025
  • Anticipated start date: March 2025
  • Anticipated completion date: July 2025


Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.


2025 Capital Improvement Program Map


2025-2029 Capital Improvement Program Map


2025-2029 Capital Improvement Program List


2025-2029 CIP Story Map


You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.

At-A-Glance

Contractor: DiMeo Brothers


Budget: $1.6 Million