Maple Leaf Drive Improvements

2025 public improvement project

The proposed project includes approximately 2,800 feet of improvements on Maple Leaf Drive from Strawberry Lane to Mary Kay Lane.

The following major improvements are included in this project:


  • Replacement of existing water main with new 8-inch diameter water main, including 1 1/2-inch water services and new b-boxes.
  • Installing additional storm inlets
  • Roadway resurfacing with new asphalt pavement
  • Curb and gutter and concrete sidewalk spot repairs
  • Driveway apron replacement (in-kind)
  • Parkway restoration with sod
Tentative Schedule

November 12, 2024 - Design open house meeting


November 2024 - Finalize design plans and bidding process


January 2025 - Contract award


April/May 2025 - Pre-construction resident meeting


Spring 2025 - Anticipated project start


Fall 2025 - Anticipated project completion

Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.


2025 Capital Improvement Program Map


2025-2029 Capital Improvement Program Map


2025-2029 Capital Improvement Program List


2025-2029 CIP Story Map


You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.

Maple Leaf At-A-Glance

Contractor: To be determined


Budget: To be determined

Adriana Webb

Engineering Division Manager

(847) 904-4414