Lincoln Street Improvements

2025 Capital Improvement Project

Lincoln Street Reconstruction Project
Lincoln St

The proposed project includes approximately 2,000 feet of improvements on Lincoln Street from Colfax Avenue to Golf Road.

The following major improvements are included in this project:


  • Replacement of existing watermain with new 8-inch diameter water main, including new 1 1/2-inch water services and new b-boxes.
  • Installing additional inlets and storm sewer laterals.
  • Roadway reconstruction with new asphalt pavement.
  • Install curb and gutter and new 5' wide concrete sidewalk.
  • Driveway replacement (in-kind)
  • Parkway restoration with sod
Tentative Schedule

November 12, 2024 - Design open house meeting


January 7, 2025 - Contract award


March 20th - Resident Pre-construction meeting at GV Public Library-Community Room East @ 6:15 pm


March 2025 - Anticipated project start


Fall 2025 - Anticipated project completion


Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.


2025 Capital Improvement Program Map


2025-2029 Capital Improvement Program Map


2025-2029 Capital Improvement Program List


2025-2029 CIP Story Map


You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.

Lincoln Street At-A-Glance

Contractor: PirTano Construction

Budget: $2.4 million

Jon Trent

Capital Projects Manager

(847) 904-4236