Short Lane, Pick Lane/Drive, and Covert Road Improvements

2025 public improvement project

The proposed project includes approximately 2,800 feet of improvements along Short Lane, Pick Lane & Pick Drive, and Covert Road from Pick Drive to Shermer Road.

The following major improvements are included in the project:


  • Replacement of existing water main with new 8-inch diameter water main, including new 1 1/2-inch water services and new b-boxes.
  • Installing additional storm sewer laterals and extension of storm sewer along Pick Lane/Drive and Covert Road.
  • Full depth roadway resurfacing with new asphalt pavement.
  • Sanitary repairs as needed.
  • Drivewa
Tentative Schedule

November 12, 2024 - Design open house meeting


December 2024 - Finalize design plans and bidding process


January 2025 - Contract award


April/May 2025 - Pre-construction resident meeting


Spring 2025 - Anticipated project start


Fall 2025 - Anticipated project completion

Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.


2025 Capital Improvement Program Map


2025-2029 Capital Improvement Program Map


2025-2029 Capital Improvement Program List


2025-2029 CIP Story Map


You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.

Adriana Webb

Engineering Division Manager

(847) 904-4414