Pfingsten Road Safety Study Open House

Monday, July 15, 2024  |  4:30 - 6:30 p.m.  |  Map It  

Sold Out

The Village will be studying the Pfingsten Road corridor between East Lake Avenue and Willow Road. Traffic data, recent accident history and the geometric design of the corridor will be reviewed as part of this study.


Resident feedback and suggestions regarding roadway medians, islands, bump-outs, turn lane revisions, bike lanes, multi-use paths, pedestrian crossings, access restrictions, landscaping, signage, curb radii, speed, and street lighting will be incorporated into the study.


Representatives from the Village and its engineering consultant, Gewalt Hamilton Associates, Inc., will be available to discuss the components of the study and answer questions.


Unable to attend? Written comments may be mailed or emailed before the close of the comment period on July 29, 2024. Mailed comments may be sent to Dayna Adamczyk, Village of Glenview, 2500 East Lake Avenue, Glenview, IL 60026 or emailed to dadamczyk@glenview.il.us


Questions or comments may be directed to Engineering Manager Adriana Webb at (847) 904-4376 or awebb@glenview.il.us.


Location:
Glenview Village Hall
2500 East Lake Avenue
Glenview, Illinois 60026