Fir Street Improvements
2025 Capital Improvement Project


The proposed Fir Street project includes approximately 1,200 feet of improvements from Shermer Road to the east cul-de-sac, and approximately 130 feet of improvements on the south half of Cedar wood Lane just north of Fir Street.
The following major improvements are included in this project:
- Replacement of existing 1,200 of water main with new 8-inch diameter Polyvinyl Chloride (PVC) water main, including new 1.5-inch water services and new b-boxes.
- Storm sewer improvements including installation of 800 feet of 12-inch and 16-inch storm sewer, new storm sewer service stubs, and new catch basins
- Sanitary service replacements.
- Roadway reconstruction with new asphalt pavement, including new curb and gutter through a Special Service Area (SSA).
- Driveway apron replacement (in-kind).
- Parkway restoration with sod.
Tentative Schedule
- Design Open House: October 17, 2024
- First consideration of an ordinance proposing the establishment of SSA 107: October 15, 2024
- Second consideration of an ordinance proposing the establishment of SSA 107: November 7, 2024
- Contract award: January 7, 2025
- First consideration of an ordinance establishing SSA 107: February 4, 2025
- Second consideration of an ordinance establishing SSA 107: February 18, 2025
- Pre-construction resident meeting: February 25, 2025
- Anticipated start date: March 2025
- Anticipated construction completion date: July 2025
September 19, 2025 09/19/2025
The week of September 15th, the contractors have finished installing the remaining asphalt driveways before installing the sod on Fir Street before preparing to install the final layer of asphalt and completing the project. The tentative plan is to pave the final surface course next week, but the contractors must first remove and replace the path at Swainwood park with new 6’ wide sidewalk.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
September 12. 2025 09/12/2025
The week of September 8th, the contractors have completed installing the concrete curb, sidewalk and driveways. Today they also were able to install the first layer of asphalt. By the end of the day, you should be able to access your driveways again. Next week the contractors will finish installing asphalt driveways before installing the sod on Fir Street before preparing to install the final layer of asphalt and completing the project.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
September 5, 2025 09/05/2025
The week of September 1st, the contractors have begun installing the concrete work beginning with installing concrete curb and driveways. During this time, we are asking that you park on the adjacent side streets called out in the notice that you should have received today and also will be redistributed on Tuesday September 2nd. Next week the contractors plan on installing the remaining driveways and begin final preparation of the road before the first layer of asphalt is installed on the road.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
August 29, 2025 08/29/2025
Fir Street Improvement Project (Tentative Completion July)
The week of August 25, the contractors have continued preparing the yards for sod and have also completed the road excavation. Next week the contractors plan on installing concrete curb starting Thursday, September 4th, where we are asking that you park on the adjacent side streets called out in the notice that you should have received today and also will be redistributed on Tuesday September 2nd. Please keep lookout for notices that we plan on hand delivering towards the end of next week explaining what to expect during the concrete pours after the holiday.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
August 22, 2025 08/22/2025
The week of August 18, the contractors have continued preparing the yards for sod and have also begun the road excavation. With this phase they will remove the existing road to the subgrade where they will then add stone to bring the new road up to grade. This will continue into next week as we will continue prepping the road with a tentative goal of beginning concrete curb work starting Wednesday, September 3rd. Please keep lookout for notices that we plan on hand delivering towards the end of next week explaining what to expect during the concrete pours after the holiday.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
August 15,2025 08/15/2025
The week of August 11, the contractors have completed installing all of the underground utilities including storm sewer, sanitary services and water main. Tomorrow they will be around doing clean up, jetting the trenches which involves pumping water where they installed pipe and clean up in yards in preparation for sod.
The following week, the contractors will continue preparing the yards for sod and also will begin the road excavation. With this phase they will removing the existing road to the subgrade where they will then add stone to bring the new road up to grade.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
August 8, 2025 08/08/2025
The week of August 4, the contractors will began making improvements to the Village storm sewer by removing and replacing the existing 6” storm sewer main with new 12” to 16” and also upsizing the structures that will help increase the capacity of the storm sewer that is currently on the street. They also reinstalled pre-existing private storm sewer services into the new main or structures as well.
The week August 11, contractors will finish installing the storm sewer and wrapping up the final sanitary connections on Fir Street before preparation for curb.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
August 1, 2025 08/01/2025
The week of July 28, the contractor has completed installing the water services and making the final connections to the watermain on Shermer road and the South Cedarwood Lane connection. During this time they also installed new sanitary services from the main to a cleanout in the right of way so that there are all new services in the public right of way.
The week of August 4, the contractors will begin making improvements to the Village storm sewer by removing and replacing the existing 6” storm sewer main with new 12” to 16” and also upsizing the structures that will help increase the capacity of the storm sewer that is currently on the street.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
July 25, 2025 07/25/2025
The week of July 21, the contractor installed water services. The new water services connect each house with a new 1.5” copper water service line as well as a new b-box and water shut off. Residents will receive notice before their new water service is scheduled to be installed. While the contractor is connecting your new service, you will experience a water service interruption that could last up to one hour. The Village understands that not having water, even for a short period of time, is an inconvenience and we greatly appreciate your patience.
The week of July 28, the contractors will continue installing water and sanitary services starting where they left off the previous week. They also plan on working on making the final connections to the existing water main on Cedarwood and Shermer so please keep an eye out on notices from public works with shutdown information.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
July 18, 2025 07/18/2025
The week of July 14, the contractor installed water services. The new water services connect each house with a new 1.5” copper water service line as well as a new b-box and water shut off. Residents will receive notice before their new water service is scheduled to be installed. While the contractor is connecting your new service, you will experience a water service interruption that could last up to one hour. The Village understands that not having water, even for a short period of time, is an inconvenience and we greatly appreciate your patience.
The week of July 21, the contractors will continue installing water and sanitary services starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
July 11, 2025 07/11/2025
The week of July 7, 2025 the contractor finished performing the necessary tests on the water main and will begin the week of July 14, 2025, they will be installing new water services on Fir Street. The new water services connect each house with a new 1.5” copper water service line as well as a new b-box and water shut off. Residents will receive notice before their new water service is scheduled to be installed. While the contractor is connecting your new service, you will experience a water service interruption that could last up to one hour. The Village understands that not having water, even for a short period of time, is an inconvenience and we greatly appreciate your patience. While the contractors are installing the water services they will also install new sanitary service that are in the road and install a new cleanout to allow for future access.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 901-6023.
July 7, 2025 07/07/2025
The week of June 30th the contractor finished installing the water main on Fir and will begin cleaning the street in preparation for the holiday,
The week of July 7th the contractor is required to perform standardized testing on the new water main before it can be put into service. These tests include pressure testing and water main chlorination.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31 or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Alex Malakowsky, by email amalakowsky@glenview.il.us or phone (847) 904-6023.
June 27, 2025 06/27/2025
The week of June 23 the contractor began work by pulverizing the existing pavement. This will essentially turn Fir Street into a gravel road. They are started the installation of the new water main. They made their initial connection on cedarwood.
The week of June 30 they will continue with the installation of water starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
June 23, 2025 06/23/2025
The week of June 16 the contractor plans on starting work on Fir Street. They began by mobilizing in materials and equipment. Also, the contractor marked out existing public and private utilities.
The week of June 23 the contractor plans to start work by pulverizing the existing pavement. This will essentially turn Fir Street into a gravel road. They are also planning to start the installation of the new water main. They will make their initial connection on Cedarwood.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
June 13, 2025 06/13/2025
The week of June 9 the contractor prepared the road for asphalt as they plan on paving the first layer of asphalt early next week on Swainwood Drive.
The week of June 16 the contractor plans on starting work on Fir Street. They plan on starting by pulverizing the existing pavement and leaving it in place making Fir street, essentially, a gravel road for the duration of the project. The contractor also plans on make the initial connection for the new water main at the intersection of cedarwood and fir. This will cause a momentary water shut down as the contractor makes the connection. Please be on the lookout for a notice from Glenview Public Works that will give more details for the shutdown.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
June 6, 2025 06/06/2025
The week of June 2 the contractor finished pouring concrete along Swainwood and Cedarwood
The week of June 9 the contractor will be preparing the road for asphalt as they plan on paving the first layer of asphalt late in the week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
May 30, 2025 05/30/2025
The week of May 26 the contractor continued preparing for curb and gutter repairs.
The week of June 2 the contractor will finish all curb and gutter repairs as well as driveway and sidewalk repairs on Swainwood and Cedarwood.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
May 23, 2025 05/23/2025
The week of May 19 the contractor continued road excavation on Swainwood Drive
The week of May 26 the contractor will finish road excavation and preparing for the new curb and gutter repairs. The contractor is tentatively planning on pouring new curb and gutter later in the week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
May 16, 2025 05/16/2025
The week of May 12 the contractor started road excavation in preparation of curb and gutter replacement and asphalt paving on Swainwood Drive.
The week of May 19 the contractor will continue road excavation on Swainwood Drive starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
May 9, 2025 05/09/2025
The week of May 5 the contractor finished installing sanitary service cleanouts and all necessary storm sewer repairs on Swainwood.
The week of May 12 the contractor is planning on starting road excavation in preparation of curb and gutter replacement and asphalt paving.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
May 2, 2025 05/02/2025
The week of April 28 the contractor continued installing sanitary service cleanouts for various houses throughout the project limits on Swainwood.
The week of May 5 the contractor is planning on finishing installing sanitary cleanouts and storm sewer repairs and will being curb and gutter repairs towards the end of the week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
April 25, 2025 04/25/2025
The week of April 21 the contractor finished installing water main and water services along Swainwood and Cedarwood. They began installing cleanouts on various homes’ sanitary services.
The week of April 28 the contractor will continue installing sanitary service cleanouts for various houses throughout the project limits on Swainwood.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
April 21, 2025 04/21/2025
The week of April 14 the contractor installed new water services on Swainwood Drive that connect each house to the new water main.
The week of April 21 the contractor will continue installing new water services starting where they left off the previous week. If the contractor finishes installing new water services they will begin storm sewer improvements along Swainwood.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
April 11, 2025 04/11/2025
The week of April 7 the contractor installed new water services on Swainwood Drive that connect each house to the new water main.
The week of April 14 the contractor will continue installing new water services starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
April 4, 2025 04/04/2025
The week of March 31, 2025 the contractor finished installing water main on Swainwood and have begun installing the new water services that connect each house to the new water main.
The week of April 7, 2025 the contractor will continue installing new water services starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
March 31, 2025 03/31/2025
The week of March 24, 2025 the contractor continued installing water main on Swainwood Drive and is now done installing the first section. This first section is from Roosevelt to Cedarwood.
The week of March 31, 2025 the contractor will continue installing water main starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
March 21, 2025 03/21/2025
The week of March 17, 2025, the contractor began installing new water main beginning at Swainwood and Roosevelt and working west. Installation of the new water main is anticipated to take four weeks.
The week of March 24, 2025 the contractor will continue installing water main starting where they left off the previous week.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
March 14, 2025 03/14/2025
During the week of March 10, 2025, the contractor began mobilization for the project and prepared the road for the installation of underground utilities on Swainwood. They pulverized the pavement on Swainwood in anticipation of water main installation next week. The contractor will also stage materials throughout the project including pipe and manholes.
The week of March 17, 2025, the contractor will begin installing new water main tentatively beginning at Swainwood and Roosevelt and working west. Installation of the new water main is anticipated to take four weeks.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
March 7, 2025 03/07/2025
Welcome to the project updates page for Fir Street Reconstruction Project. Project updates will typically be posted on Fridays of each week. The contract was awarded to DiMeo Brothers Inc. of Elk Grove Village Illinois.
During the week of March 10, 2025, the contractor will begin mobilization for the project. This includes utility markings and layout in advance of the new water main and storm sewer spot repairs. The contractor will also stage material throughout the project including pipe and manholes.
The week of March 17, 2025, the contractor will begin installing new water main tentatively beginning at Swainwood and Roosevelt and working west. Installation of the new water main is anticipated to take four weeks.
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=31
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Dayvohn Braxton, by email dbraxton@glenview.il.us or phone (847) 904-4238.
YOUR EMAIL ADDRESS IS SUCCESSFULLY REMOVED FROM UPDATE ALERT LIST.
Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.
2025 Capital Improvement Program Map
2025-2029 Capital Improvement Program Map
2025-2029 Capital Improvement Program List
You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.
Fir Street At-A-Glance
Contractor: DiMeo Brothers
Budget: Estimated at $1.6 million*
*These costs are estimates. Actual costs will be based on the lowest bid and the loan interest rate for the SSA portion of the project.
Fir Street Project Library
Jon Trent
Capital Projects Manager
(847) 904-4236What can we help you with today?
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.