Shermer Road Improvements

2025 Capital Improvement Project

Resurfaced Road
Rectangular Rapid Flashing Beacon (RRFB)
 

The proposed Shermer Road resurfacing & bike lane project includes 1.6 miles of improvements from Golf Road to East Lake Ave.




The proposed improvements will consist of:

  • Road resurfacing
  • Curb & gutter spot repairs
  • Sidewalk spot repairs
  • Parkway restoration
  • Designated bike lane
  • Rectangular rapid flashing beacon at the existing crosswalk near Swenson Park


Ciorba Group, Inc Engineers will be managing and inspecting this project.

Tentative Schedule

Contract Award- June, 2025

Start date- Summer, 2025

End date- Summer, 2025

Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.


2025 Capital Improvement Program Map


2025-2029 Capital Improvement Program Map


2025-2029 Capital Improvement Program List


2025-2029 CIP Story Map


You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.

At-A-Glance

Contractor: Peter Baker

Budget: $2.9 million

Jon Trent

Capital Projects Manager

(847) 904-4236