Swainwood Neighborhood

2026 Capital Improvement Project

Project Location Map
Project Location Map

The proposed project includes approximately 3,200 linear feet of improvements along Swainwood Drive, Alvin Court, Buttonwood Lane, Spruce Street, and Elm Street/Court.

Phase I- 2026

  • Swainwood Drive- Roosevelt Ave to Spruce Dr
  • Alvin Court- North of Swainwood Dr
  • Buttonwood Lane


Phase II- 2027

  • Spruce Drive- Fir St to Lehigh Ave
  • Alvin Court- South of Swainwood Dr
  • Elm Court
  • Elm Street- 1214 Elm St to Spruce Dr


Scope of Work

  • Roadway reconstruction with new asphalt pavement and curb & gutter through SSA
  • Upgraded storm sewer system, including new drainage structures along the new curb & gutter for improved drainage
  • Sanitary sewer and water main repairs/adjustments as needed
  • Street light relocations as needed
  • Driveway apron replacement (in-kind)
  • Parkway restoration with sod



Tentative Schedule

Oct 28 2025 - Design Open House meeting


Nov 2025 - Finalize design plans and bidding process


Jan 2026 - Contract award


Feb/March 2026 - Pre-construction resident meeting


April 2026 (Phase I) - Anticipated project start


Late Summer 2026 (Phase I) - Anticipated project completion

Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.


2026 Capital Improvement Program Map


2026-2030 Capital Improvement Program Map


2026-2030 Road and Infrastructure Program List


2026-2030 CIP Story Map


You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.

At-A-Glance

Contractor- TBD

Budget-$3.7 million

Project Library

Swainwood Design Meeting PP | Click here to open

Dayvohn Braxton

Engineering Project Manager

(847) 904-4238

Jon Trent

Capital Projects Manager

(847) 904-4236