Larkdale Dr & LIncoln St Improvements

2026 Capital Improvement Project

The proposed project includes approximately 1,900 LF of improvements along Larkdale Drive and Lincoln Street.


Limits:

Larkdale Dr & Cul-De-Sac- Harlem Ave to Pavement Change

Lincoln St- Larkdale Dr to Linneman St


Scope of Work

  • Replacement of existing water main with new 8-inch diameter water main, including new 1.5” water services and new b-boxes.
  • Roadway reconstruction with new asphalt pavement & curb and gutter
  • New sidewalk on both sides of Lincoln St and the north side of Larkdale Dr . Sidewalk extension along the north side of Larkdale Dr from the existing sidewalk to the western project limits
  • Upgraded storm sewer system, including new & additional drainage structures, and storm sewer extension into the Larkdale cul-de-sac
  • Sanitary repairs as needed
  • Driveway apron replacement (in-kind)
  • Parkway restoration with sod
Tentative Schedule
  • Nov 13 2025- Design Open House
  • Nov/Dec 2025- Finalize plans and bidding process
  • Jan 2026- Contract Award
  • March 2026- Pre-Con Resident Meeting
  • Late March 2026- Anticipated Start Date

Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.


2026 Capital Improvement Program Map


2026-2030 Capital Improvement Program Map


2026-2030 Road and Infrastructure Program List


2026-2030 CIP Story Map


You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.

At-A-Glance

Contractor: To be Bid

Budget: $2.6 million

Dayvohn Braxton

Engineering Project Manager

(847) 904-4238