2026 Capital Improvement Project
The proposed project includes approximately 1,900 LF of improvements along Larkdale Drive and Lincoln Street.
Project Limits
- Larkdale Dr & Cul-De-Sac- Harlem Ave to Pavement Change
- Lincoln St- Larkdale Dr to Linneman St
Scope of Work
- Replacement of existing water main with new 8-inch diameter water main, including new 1.5” water services and new b-boxes.
- Roadway reconstruction with new asphalt pavement & curb and gutter
- New sidewalk on both sides of Lincoln St and the north side of Larkdale Dr . Sidewalk extension along the north side of Larkdale Dr from the existing sidewalk to Spruce Street.
- Upgraded storm sewer system, including new & additional drainage structures, and storm sewer extension into the Larkdale cul-de-sac
- Sanitary repairs as needed
- Driveway apron replacement (in-kind)
- Parkway restoration with sod
Tentative Schedule
- Nov 13 2025- Design Open House
- Nov/Dec 2025- Finalize plans and bidding process
- Jan 20 2026- Contract Award
- February, 25 - Pre-Con Resident Meeting @ 5:30 in the Glenview Library
- Early March 2026- Anticipated Start Date
May 15, 2026 05/15/2026
For this week and next the contractors will continue to install storm sewer within the project limits. After the storm sewer is installed, the contractors will begin with the road improvements.
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=62
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Patrick O’Donoghue, by email podonoghue@glenview.il.us or phone (847) 904-4454.
May 11, 2026 05/11/2026
Last week the contractors have begun the final stage of the underground utility which is the storm sewer. We anticipate the contractors working on this for the next month as they will be installing the storm sewer services throughout the project limits before moving to the final road improvements..
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=62
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Patrick O’Donoghue, by email podonoghue@glenview.il.us or phone (847) 904-4454.
May 1,2026 05/01/2026
This week the contractors have finished installing water services and sanitary laterals that cross under the road. They have also made the final connections to the water main as well. For the next month the contractors plan on installing the storm sewer main and services throughout the project limits before moving to the final road improvements..
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=62
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Patrick O’Donoghue, by email podonoghue@glenview.il.us or phone (847) 904-4454.
April 24, 2026 04/24/2026
This week the contractors have continued installing water services and sanitary laterals that cross under the road and plan should be completing this early next week. After that is completed, the contractors will move to begin installing the storm sewer in the street and also make the final connection to the water main. Be on the lookout for additional notices for short term water shutdown at your property, these will be brief and will occur in the morning or afternoon. Once again, you will be notified the day before this will occur and contractors will knock on your door the morning of as well as a reminder.
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=62
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Patrick O’Donoghue, by email podonoghue@glenview.il.us or phone (847) 904-4454.
April 10, 2026 04/10/2026
This week the contractors have continued installing water services and some sanitary laterals that cross under the road and plan on continuing for the next two weeks. Be on the lookout for additional notices for short term water shutdown at your property, these will be brief and will occur in the morning or afternoon. Once again, you will be notified the day before this will occur and contractors will knock on your door the morning of as well as a reminder.
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=62
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Patrick O’Donoghue, by email podonoghue@glenview.il.us or phone (847) 904-4454.
March 27, 2026 03/27/2026
The week of March 16th, 2026, the contractor will continue installing new water main on Larkdale working east and installation of the new water main is anticipated to take four weeks.
This week the contractors have finished the water main connection for the entire street and will begin the water main testing which is required before starting the water services. Be on the lookout for additional notices for short term water shutdown at your property, these will be brief and will occur in the morning or afternoon. Once again you will be notified the day before this will occur and contractors will knock on your door the morning of as well as a reminder. Next week, contractors will continue pavement removal in anticipation of storm sewer main on Larkdale.
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=62
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Patrick O’Donoghue, by email podonoghue@glenview.il.us or phone (847) 904-4454.
March 20, 2026 03/20/2026
Welcome to the project updates page for Larkdale Drive and Lincoln Street Reconstruction Project. Project updates will typically be posted on Fridays of each week. The contract was awarded to DiMeo Brothers Inc. of Elk Grove Village Illinois.
During last week beginning March 9th, 2026 the contractor has mobilized for the project. This includes utility markings and layout in advance of the new water main and storm sewer spot repairs. The contractor began by making a connection to the existing water main on the West side of Larkldale and will continue installing the water main to the East.When there is temporary shut down for the water main residents can expect Glenview Public works will let residents know at least 24 hours before any planned shutdowns.
The week of March 16th , 2026, the contractor will continue installing new water main on Larkdale working east and installation of the new water main is anticipated to take four weeks.
Please remember these dates are dependent on suitable weather.
Please watch for further information via the project website at https://www.glenview.il.us/index.php?section=construction-projects&projectsection=2&project=62
or by hand delivered notices.
If you have any questions about the project or project updates please contact the project manager, Patrick O’Donoghue, by email podonoghue@glenview.il.us or phone (847) 904-4454.
YOUR EMAIL ADDRESS IS SUCCESSFULLY REMOVED FROM UPDATE ALERT LIST.
Capital Improvement Program
The Village annually updates its five-year Capital Improvement Program.
2026 Capital Improvement Program Map
2026-2030 Capital Improvement Program Map
2026-2030 Road and Infrastructure Program List
You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.
At-A-Glance
Contractor: DiMeo Brothers
Budget: $2.6 million
Patrick O'Donoghue
Project Manager
(847) 904-4454Adriana Webb
Director of Capital Projects, Engineering & Facilities
(847) 904-4414What can we help you with today?
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor, sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum, dolor sit.
-
Lorem, ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.
-
Lorem ipsum dolor sit.