Elm St & Hickory Ct Improvements

2026 Capital Improvement Project

The proposed project includes approximately 2.300 LF of improvements along Elm Street and Hickory Court.

Phase I- 2026

  • Elm Street- Colfax Ave to McArthur Dr


Phase II- 2027

  • Elm Street- McArthur Dr to the South Cul-De-Sac
  • Hickory Court- Shermer Rd to Elm St

Scope of Work- Reconstruction Project

  • Replacement of existing water main with new 8-inch diameter water main, including new 1.5” water services and new b-boxes.
  • Roadway reconstruction with new asphalt pavement, curb and gutter, & sidewalk
  • Upgraded storm sewer system, including new drainage structures along the curb & gutter for improved drainage
  • Sanitary repairs as needed
  • Driveway apron replacement (in-kind)
  • Parkway restoration with sod



Tentative Schedule
  • Nov 13 2025- Design Open House
  • Dec/Jan- Finalize plans and bidding process
  • Winter 2026- Contract Award
  • Spring 2026- Pre-Con Resident Meeting- Phase I
  • Spring 2026- Anticipated Start Date- Phase I
  • Spring 2027-Anticipated Start Date- Phase II


Capital Improvement Program

The Village annually updates its five-year Capital Improvement Program.


2026 Capital Improvement Program Map


2026-2030 Capital Improvement Program Map


2026-2030 Road and Infrastructure Program List


2026-2030 CIP Story Map


You can make suggestions and leave feedback about conditions of infrastructure for the next CIP by dropping a pin in this interactive map.

At-A-Glance

Contractor: To be bid

Budget: $3.6 million

Dayvohn Braxton

Engineering Project Manager

(847) 904-4238